Application
Transformer Enclosures (Walls & Ceilings)
Fire Rating
4 Hours
Site Altitude
>3000m
Ambient Temperature
-10°C
The fitout subcontractor for SSE came to us with a newly built wind farm for the power sector in a remote part of Scotland, tucked just out of view from the famous Loch Ness. They required three 4-hour fire-rated transformer enclosure bays, including walls and ceilings, as well as internal access doors for maintenance personnel. In addition, various penetrations had to safely pass through the barriers, including wall bushings.
At an altitude of more than 3000m, site delivery and access would prove to be extremely difficult, requiring navigation of a 10 mile man-made service road, a further five miles up to base camp and then an additional five miles to the working platform. The altitude and geography also meant that any solution would have to be constructed and remain fully functional in extreme climate conditions, including temperatures of -10°C, high winds and extremely heavy snow. Construction needed to continue throughout the worst of these conditions in order to be completed to schedule.
The project was fully completed within nine weeks in extremely harsh working conditions, which we achieved by working longer hours each day and on weekends. Walls had to be erected in high wind and snow conditions without the main building roof in position. We provided full handover and certification to the client, including the certification of our Durasteel barriers, ceilings, doors and fire seals to penetrations. We received extremely positive feedback from the main contractor and the fitout subcontractor (our client), which can be read below.
“I’m the sub agent at Stronelairg substation in charge of all subcontractors with the substation we are constructing. I wanted to get in touch and introduce myself as I have been highly impressed with Kevin and his team over the past 9 weeks. They are carrying out essential work for me under global construction, and on behalf of myself and company who are the Principal contractor on site, we thank them for all their efforts.
“I can’t praise them highly enough – their work ethic, health & safety awareness, quality of workmanship and general site presence have been to the highest of standards. My CEO Steve Fox was on site and Scottish and north of England directors were on site and they couldn’t be more impressed with them.
“Their attitude to working in such a remote location and difficult tight work zones has been second to none. Their personalities and attitude has rubbed off on everyone on the site and improved our other subcontractors, but most importantly they have been a key factor of us having a excellent team morale on site.
“I can’t thank them enough and look forward to their return. My client SSE are also impressed, and they have had so much positive feedback and been key to us achieving high health and safety reviews – plus again, their work ethic is highly impressive for the work that they do.”
DS – Sub Agent, BAM Nuttall Limited